44 lines
1.4 KiB
Markdown
44 lines
1.4 KiB
Markdown
#Requirement Repositories.
|
|
|
|
The aim of the NorthStart project is to developp a water purificator machine. The system is devided into several sub system described below.
|
|
|
|
The main components identified in the system are
|
|
|
|
- The Doking Station
|
|
- Production Units (1 or more)
|
|
- Valve Board ( several )
|
|
- Conductivity Bard (several)
|
|
|
|
The aim of this repository is to structure the requirements of the project in
|
|
such a way that we can track the achieved developpement state.
|
|
|
|
For each sub system, we define Feature Requirements, Design Requirements, Test Requirements. Each Feature must have a Test case the describes how it's tested.
|
|
From each Design Requirements derive Test Requirement that state what is beeing tested. The Test Requirements for the firmwares shall be Software testes.
|
|
|
|
|
|
## Docking Station
|
|
|
|
The files listed below collect all requirements Related to the Docking Station
|
|
* DS\_Features.reqif
|
|
* DS\_DesignRequirements.requif
|
|
* DS\_TestRequirements.reqif
|
|
|
|
The DesginRequirements shall be divided in several Packages. Like :
|
|
- The Communication package
|
|
- The ParameterHandler package
|
|
- The HAL which abstracts the STM32 HAL package
|
|
- The Application package
|
|
- The Storage Package
|
|
- The Processing package Might be devided into several sub packages
|
|
|
|
## Production Unit
|
|
|
|
The files listed below collect all requirements Related to the Docking Station
|
|
* PU\_Features.reqif
|
|
* PU\_DesignRequirements.requif
|
|
* PU\_TestRequirements.reqif
|
|
|
|
## Valve Board
|
|
|
|
## Conductivity Board
|