# Requirement Repositories.
|
||||
|
||||
The aim of the NorthStart project is to developp a water purificator machine. The system is devided into several sub system described below.
|
||||
|
||||
|
|
@ -33,11 +33,25 @@ The DesginRequirements shall be divided in several Packages. Like :
|
|||
|
||||
## Production Unit
|
||||
|
||||
The files listed below collect all requirements Related to the Docking Station
|
||||
The files listed below collect all requirements Related to the Production Unit
|
||||
* PU\_Features.reqif
|
||||
* PU\_DesignRequirements.requif
|
||||
* PU\_TestRequirements.reqif
|
||||
|
||||
## Common Requirements between the Valve Board and the Conductivity Board
|
||||
|
||||
## Valve Board
|
||||
|
||||
The files listed below collect all requirements Related to the Valve Board
|
||||
|
||||
* VB\_Features.reqif
|
||||
* VB\_DesignRequirements.requif
|
||||
* VB\_TestRequirements.reqif
|
||||
|
||||
## Conductivity Board
|
||||
|
||||
The files listed below collect all requirements Related to the Conductivity Board
|
||||
|
||||
* CB\_Features.reqif
|
||||
* CB\_DesignRequirements.requif
|
||||
* CB\_TestRequirements.reqif
|
||||
|
|
|
|||